Audit-to-deploy gap

Symbiotic's assessment for RD-F-006 — scored yellow on the v1.7.0 rubric. The evidence below is the curator's reasoning for this score.

Evidence summary #

Certora audit ended September 2 2024; mainnet deployed January 28 2025 = 148 days. Zellic audit July 15-22 2024 to deploy = approximately 190 days. Both exceed the 60-day drift threshold. The interval was used for devnet testing and staged rollout, reducing actual risk, but the time gap remains above threshold.

Sources #

Methodology #

Measure the number of days between the audit report sign-off date and the mainnet deploy of the audited bytecode.

See the full factor methodology and distribution across all protocols →