Audit-to-deploy gap
Symbiotic's assessment for RD-F-006 — scored yellow on the v1.7.0 rubric. The evidence below is the curator's reasoning for this score.
Evidence summary #
Certora audit ended September 2 2024; mainnet deployed January 28 2025 = 148 days. Zellic audit July 15-22 2024 to deploy = approximately 190 days. Both exceed the 60-day drift threshold. The interval was used for devnet testing and staged rollout, reducing actual risk, but the time gap remains above threshold.
Sources #
- URL
- Certora Symbiotic Report (Aug-Sep 2024)Certora audit August 12 - September 2 2024retrieved 2026-05-16
Methodology #
Measure the number of days between the audit report sign-off date and the mainnet deploy of the audited bytecode.
See the full factor methodology and distribution across all protocols →
rubric_version v1.7.0 protocol symbiotic factor RD-F-006 score yellow collected_at 2026-05-16 09:25:24