defirisk.co
rubric v1.7.0

Audit-to-deploy gap

Babylon Protocol's assessment for RD-F-006 — scored green on the v1.7.0 rubric. The evidence below is the curator's reasoning for this score.

Evidence summary #

Phase-1: Coinspect report Aug 5 2024, mainnet Aug 22 2024 — 17-day gap (excellent). Zellic Phase-1 ended May 31 2024, Phase-1 launch Aug 22 2024 — 83 days (at margin but acceptable). Genesis chain: Coinspect/Zellic Phase-2 completed Feb–Mar 2025; Genesis launched April 10 2025 — 38–59-day gap (within threshold). No >90-day drift detected for confirmed deployments.

Sources #

  • Docs
    Protocol profile §2Profile §2 lifecycle (Genesis launch Apr 10 2025)retrieved 2026-05-04
  • URL
    Babylon Phase-1 mainnet launchPhase-1 launch blog (Aug 22 2024 launch date)retrieved 2026-05-04

Methodology #

Measure the number of days between the audit report sign-off date and the mainnet deploy of the audited bytecode.

See the full factor methodology and distribution across all protocols →

rubric_version v1.7.0 protocol babylon-protocol factor RD-F-006 score green collected_at 2026-05-04 19:43:27