defirisk.co
rubric v1.7.0

Contributor tenure at admin-permissioned PR

Multipli's assessment for RD-F-116 — scored yellow on the v1.7.0 rubric. The evidence below is the curator's reasoning for this score.

Evidence summary #

GitHub repo `multipli-libs/Barebones-MultipliVault` shows 3 commits by single contributor Sidharth1013: Jan 12 and Jan 16, 2026. Apparent repo-tenure for this contributor: <30 days (first visible commit Jan 12, last Jan 16). However, per README this is a stripped public-facing repo; actual internal codebase is separate. Admin-permissioned changes to production contracts are made via the internal repo, which is not publicly accessible. Yellow reflects the <30-day visible tenure of the only public contributor; the internal repo contributor history is unknown.

Sources #

Methodology #

Measure the number of days contributing to the repo of the author of the most recent admin-permissioned code change.

See the full factor methodology and distribution across all protocols →

rubric_version v1.7.0 protocol multipli factor RD-F-116 score yellow collected_at 2026-05-17 11:48:35