defirisk.co
rubric v1.7.0

Security-Council threshold reduction (RT)

Lido's assessment for RD-F-182 — scored green on the v1.7.0 rubric. The evidence below is the curator's reasoning for this score.

Evidence summary #

GateSeal Committee threshold: 3-of-6 (confirmed from data-cache Safe API). EmergencyProtectedTimelock minimum delay: 259,200 seconds (3 days, per profile §6). No threshold reduction events or timelock removal events detected as of 2026-04-28. Dual Governance emergency committees (Tiebreaker Core, Reseal Committee) intact. The Drift Protocol reference case (3/5 → 2/5 SC change + timelock removal, 6 days before $285M DPRK exploit) makes this signal highest-priority to wire for Lido. Parameters to monitor: GateSeal Committee threshold change from 3-of-6 to lower; EmergencyProtectedTimelock MIN_EXECUTION_DELAY reduction below 3 days; new signer additions within ≤14 days of either.

Sources #

Methodology #

Detect in real-time whether the bridge/protocol Security Council multisig executes a threshold reduction (e.g. 3/5 → 2/5), timelock removal, or new-signer addition within ≤14 days of either of those events.

See the full factor methodology and distribution across all protocols →

rubric_version v1.7.0 protocol lido factor RD-F-182 score green collected_at 2026-04-28 13:58:42