defirisk.co
rubric v1.7.0

Bridge rate-limiter / chain-pause as positive mitigant

Concrete's assessment for RD-F-185 — scored not_applicable on the v1.7.0 rubric. The evidence below is the curator's reasoning for this score.

Evidence summary #

Concrete is not a bridge protocol and has no bridge rate-limiter mechanism. Cross-chain pre-deposit vaults exist (Berachain, Stable Network) but no bridge rate-limiter has been identified. Factor RD-F-185 measures bridge rate-limiter as a positive mitigant — not applicable here.

Sources #

  • Internal
    00-profile.md §7 + 00-data-cache.json — no bridge rate-limiterProfile §7: bridge mechanism unidentified; data cache layerzero.present=false; profile has_bridge_surface=uncertain (lean false); is_a_bridge=falseretrieved 2026-05-17

Methodology #

Determine whether the bridge implements a per-window outflow rate-limiter (and at what cap), and whether the protocol team can trigger a chain-level or validator-set emergency pause.

See the full factor methodology and distribution across all protocols →

rubric_version v1.7.0 protocol concrete factor RD-F-185 score not_applicable collected_at 2026-05-17 14:36:59