defirisk.co
rubric v1.7.0

Bridge signer-set change proposed/executed

Cap (cUSD / stcUSD)'s assessment for RD-F-103 — scored yellow on the v1.7.0 rubric. The evidence below is the curator's reasoning for this score.

Evidence summary #

T-09 v1 launch signal. LayerZero OFT bridge is live for cUSD and stcUSD to MegaETH — confirmed by: (a) Electisec 'LZ vault' audit scope dated 2025-05-25, (b) cap.app blog post announcing MegaETH launch 2026-01-05, (c) same vanity addresses (0xcCcc...cccC, 0x8888...8888) on both chains. Data cache `layerzero.present:false` is a confirmed pipeline false negative. No DVN signer-set change events detected from OSINT as of 2026-05-17. Signal is applicable but DVN configuration (OApp address, DVN count, DVN threshold) cannot be verified without curator locating the LayerZero OApp address on Ethereum mainnet — a known gap. Yellow: signal should fire on this protocol; live arming requires OApp address verification.

Sources #

Methodology #

Detect whether a bridge validator or signer-set change has been proposed or executed.

See the full factor methodology and distribution across all protocols →

rubric_version v1.7.0 protocol cap factor RD-F-103 score yellow collected_at 2026-05-17 10:56:24