★ Admin = deployer EOA after 7 days
Aerodrome Finance's assessment for RD-F-043 — scored green on the v1.7.0 rubric. The evidence below is the curator's reasoning for this score.
Evidence summary #
Team multisig (0xE6A41fE61E7a1996B59d508661e3f524d6A32075) was created 2023-08-22, six days before protocol launch (2023-08-28). Admin transferred to multisig at or before launch. Deployer EOA did not retain permanent admin beyond launch period.
Sources #
- URLTeam Safe config — creation before launchSafe API confirms team Safe created via Safe Proxy Factory before protocol launchretrieved 2026-05-04
- Team Multisig creation dateBaseScan team multisig — created 2023-08-22 (6 days before launch)retrieved 2026-05-04
Methodology #
Determine whether, at t = deploy+7d, the admin address still equals the deployer EOA with no evidence of transfer to a multisig.
See the full factor methodology and distribution across all protocols →
rubric_version v1.7.0 protocol aerodrome factor RD-F-043 score green collected_at 2026-05-04 19:56:03